BC Hydro - Bridge River Power Project - Bridge River, BC

Electrical and instrumentation installations for Cooling Water upgrade.

Customer: The Gisborne Group
Date: July 2014 - July 2015
Workforce: 5

NOTE: the following list displays the currently available fields that can be populated and displayed along with each project. This is can be edited, just a matter of letting me (Greg) know what to keep, toss, and add.

  • name
  • category
  • summary
  • description
  • photo
  • brochure
  • gallery
  • customer
  • value
  • peak workforce
  • date

Return

24 HOUR EMERGENCY SERVICE
250.563.4100 • CLASS A LICENSED & BONDED